Mon–Fri 9–5 ET · Nationwide crews
Circuit breakers and terminal blocks inside an electrical panel

Electrical & Infrastructure

Power & Low Voltage

Clean power, proper grounding and pathways sized for what comes next: the unglamorous work that keeps every other system alive.

Overview

Systems fail where the power and pathway were an afterthought

Low voltage systems are only as reliable as the power feeding them and the pathway carrying them. Undersized PoE budgets, shared circuits that brown out, missing grounding, no surge protection, no conduit to add the next cable. These are the defects we are called in to fix years later, usually during an outage.

Wiscom handles both sides. We install the dedicated circuits, receptacles, rack power, UPS and grounding that support your equipment, and the conduit, tray, sleeves and firestopping that let cable get where it needs to go safely and legally.

Everything is installed to NEC requirements and coordinated with the electrical contractor and GC on new construction, or planned around occupied space and existing conditions on a remodel.

Power and Low Voltage installed by Wiscom Services Inc.

Where we deploy it

  • New construction
  • Tenant improvements
  • Equipment rooms
  • Exterior & site work
  • Industrial plants
  • Retail rollouts
  • Gate & access power
  • Generator coordination

Talk to an estimator

Send us drawings, a device count, or just the square footage, and we’ll tell you what the scope realistically looks like.

Capabilities

What this service actually includes.

Not a category heading, but the specific work we self-perform under it.

Dedicated circuits & devices

Branch circuits for racks, AV positions, displays, gates and equipment rooms; receptacles, whips and disconnects; panel schedules updated so the next electrician knows what is where.

PoE power engineering

PoE, PoE+ and PoE++ budget calculations across the switch stack, midspan injectors where needed, and cable and bundle sizing that accounts for the heat high-wattage PoE actually generates.

UPS & backup power

Rack and wall-mount UPS sizing with real runtime calculations, managed PDUs, automatic shutdown integration, and coordination with generator circuits so critical systems ride through an outage.

Grounding, bonding & surge

Telecom grounding bus bars, rack and ladder bonding, equipotential bonding to building ground, and surge protection on power, data and outdoor camera and antenna runs.

Pathways & raceway

EMT and PVC conduit, cable tray and basket tray, sleeves and core drilling, trenching and directional boring for site work, and firestopping every penetration through a rated assembly.

Lighting & building controls

Low voltage lighting control, occupancy and daylight sensors, exterior and parking lot lighting circuits, and control wiring for building systems and equipment.

Specification

How we decide what to specify.

The reference table our estimators and engineers work from when scoping this service.

PoE standardPower at devicePowersCable we recommend
802.3af (PoE)12.95 WVoIP phones, basic APs, fixed camerasCat5e or better
802.3at (PoE+)25.5 WPTZ cameras, Wi-Fi 6 APs, door controllersCat6 minimum
802.3bt Type 351 WWi-Fi 6E/7 APs, video panels, heated domesCat6A
802.3bt Type 471 WDisplays, LED lighting, thin clientsCat6A, bundle-aware routing

Close-out

What you receive when we’re done.

Documentation is part of the scope, not a favor. Every power and low voltage project closes out with the same package, so the next person to touch the system, whether that is us or somebody else, can work from facts.

Ask for this list on every bid you receive. A contractor who cannot produce test results and as-builts is asking you to trust that the work was done right.
  • Updated panel schedules and circuit directory
  • PoE budget worksheet per switch and closet
  • UPS runtime calculation and load list
  • Grounding and bonding verification
  • Firestop locations photographed and logged
  • Conduit and pathway as-built with spare capacity noted

FAQ

Power & Low Voltage: common questions

The device itself does not. The switch powering it does. When a PoE switch supporting thirty cameras shares a circuit with a break room microwave, one tripped breaker takes out your entire security system. Dedicated, clearly labeled circuits for network and security equipment is basic resilience and costs very little at rough-in.

Long enough to either ride out the typical outage or shut down cleanly. Fifteen to thirty minutes covers most utility blips and gives servers time for a graceful shutdown. If you need to stay up through an extended outage, that is a generator conversation and we will size the UPS as the bridge to it.

Where the work requires it, yes: we handle permitting and inspection coordination with the local jurisdiction as part of the project, and we tell you up front which portions of a scope are permit-triggering.

Yes. We trench, directional bore under drives and walkways, install rated underground raceway and hand holes, and terminate in weatherproof enclosures for gates, cameras, lighting and building-to-building runs.

Free estimate · No obligation

Let’s scope your project.

Tell us what the building has to do. We’ll walk the site, design the system around it and give you a written estimate with no line items you can’t explain.

  • Site survey before we quote, not after
  • Written scope so you can compare bids honestly
  • One accountable contractor across every low voltage trade
Request a free estimate (470) 420-8885 Email the team

Mon–Fri 9:00am–5:00pm ET · HQ in Doraville, GA · Crews nationwide

Call Free Estimate